Understanding the Role of Excavating Contractors in Site Preparation

Local teamHigh quality fleetCompany established 2012Free on-site quotesFamily run and operated5 star serviceLocal teamHigh quality fleetCompany established 2012Free on-site quotesFamily run and operated5 star service
Local teamHigh quality fleetCompany established 2012Free on-site quotesFamily run and operated5 star service

· by Rick Kosta

Before a single course of bricks goes down, there is a long list of groundwork that has to be sorted. Site preparation is the stage that decides how stable the finished structure will be and how well it performs over the decades that follow, and it happens almost entirely before anything recognisable as a building appears.

Most Melbourne blocks are not naturally ready for construction. The land may need levelling, excess soil taken away, old concrete or rock broken out, and drainage planned before any pipe is laid. That is why builders bring excavating contractors in at the very beginning. If you are about to start a build and you are not sure what that early work actually consists of, this is the sequence, roughly in the order it happens on site.

What happens during site preparation

Every block starts differently depending on soil type, slope, what was there before and what is going on top. The steps below apply to most builds, though the effort each one takes varies enormously from one street to the next.

Locating services and setting out

Nothing gets dug until the underground services are known. Power, gas, water, sewer and telecommunications all have to be identified and marked, and the dig lines set out against the plans. On established Melbourne blocks there is often more down there than the records suggest, including abandoned pipework from earlier buildings. Getting this right at the start is what keeps the rest of the job uneventful.

Clearing and stripping

The site is cleared of vegetation, tree roots, loose rubble, old paving, broken concrete and anything else in the way of access or the footprint. Topsoil and any unsuitable upper layers of soil are then stripped off, because organic material and soft fill compress and move once load goes on them. Stripping is not tidying up. It is removing the layers that would otherwise shift under the building.

Cutting, filling and levelling

With the site clear, the shaping starts. This means creating level building platforms, cutting into the higher part of the block and filling the low points to the levels shown on the plans. On a sloping block this is the bulk of the work, and it is where a site cut and retaining may be needed to hold back the cut face.

How the ground is shaped has a direct effect on how the block drains and how well the footings sit. A poorly shaped site sends water where it should not go, which shows up later as damp around slabs, pressure behind retaining walls and soggy garden beds that never dry out.

Breaking out rock, old footings and concrete

Plenty of Melbourne sites have material under the surface that has to come out: basalt and other hard rock, old footings, buried slabs and compacted fill from a previous build. None of it can be left where the new footings are going. Breaking it up takes heavier machinery than the digging itself, usually a rock breaker on an excavator, plus trucks to cart the spoil away.

This is also the stage most likely to produce a surprise, because you cannot see through soil. The more thoroughly it is dealt with, the less it interrupts the trades that follow.

Trenching and drainage

Drainage planning starts well before any pipe is installed. Excavators cut the trenches for stormwater, sewer and service runs, at the depths and falls the design calls for. Surface drainage matters just as much: where water will run once the roof and paving are on, and where it will end up.

Skip or rush this and the results are predictable. Water pools where it should not, soil moisture varies across the site, and reactive clay swells and shrinks unevenly under the slab. Melbourne clay is very good at punishing bad drainage.

Compaction and testing

Fill that has been placed has to be compacted in layers, not tipped in and levelled off. Compaction is what makes engineered fill capable of carrying load, and it is usually tested before the footings go in. This is the least visible step on the list and one of the most important, because everything above it depends on the ground not moving.

Foundation and footing excavation

Last comes the excavation for the footings themselves: the trenches, pads or piers set out to the engineer's drawings, dug to the specified depth and width, with the sides kept safe and stable while the concrete crew works in them. Precision matters here in a way it does not earlier in the process, because these dimensions come straight off the structural design.

Why the groundwork makes such a difference

Site preparation is invisible in the finished building, which is exactly why it gets underestimated. Here is what it is actually buying you.

Structural reliability

Footings and slabs need firm, evenly prepared ground beneath them. Where soil has not been compacted properly, or rubble has been left in the wrong place, the structure moves more than it was designed to. That movement is what turns into cracking in walls and slabs over time, and it is far cheaper to prevent at this stage than to chase afterwards.

Water control

A block that drains well is easier to live with and far less likely to develop problems after heavy rain. Small decisions about ground shape, trench falls and where water is directed have a long life. They determine whether the property stays dry through a wet Melbourne winter or whether you spend the next ten years managing dampness.

A build that keeps moving

Unexpected rock, buried concrete or uneven ground stops work while it gets dealt with, and every trade behind it waits. Thorough site preparation means the concreters, plumbers and framers arrive to a site that is ready for them, which is where the schedule is really won or lost.

What to expect on your own site

Timeframes vary widely. A flat block with good access and clean soil might be prepared in a few days, while a steep site with rock, restricted access and significant spoil to cart away can take weeks. The variables that move the number most are slope, ground conditions, access for machinery and trucks, and how much material has to leave the site.

Access deserves particular thought. If the only way in is a narrow side path, the work will be done with smaller machines and more passes, and that is a cost worth knowing about before the quote arrives. Businesses that handle their own groundwork sometimes find it makes more sense to bring machines in as needed, which is the reasoning behind the case for hiring plant and machinery rather than owning it.

Getting the groundwork right from the start

Construction sits on the quality of what is underneath it. A cleared, well-shaped, properly drained and correctly compacted site lets the rest of the project proceed without the interruptions that cost real money.

Kosta & Sons handles excavation, site cuts, bulk earthworks, drainage preparation, and rock and concrete removal across Melbourne. Have a look at our Melbourne excavation services, or if you are still choosing who to engage, our checklist for hiring earthmoving contractors in Melbourne covers what to check before you sign. Call Rick on 0456 614 439 to talk through your site.

Ready to act on this? Explore our excavation and earthmoving services, or learn more about plant and machinery hire.

Keep reading

The quality you deserve, and dependability you can count on.

Kosta and Sons excavator working a Melbourne site at dusk

Planning a project that needs earthmoving?

Contact us right away! Let us help with your next project, from earth moving to concrete removal. We have the skills, team, and tools to make it happen.

Contact Us